Product development

 
Q1: What is the process for before placing orders if there is no need new tool process
  Once the pack confirmed, we will run the following process
1. Check Quotation / Price/ Trade terms
2. Testing sample submit
3. Artwork - LIBO will provide deco area
4. PPS sampling/ Order 
5. PPS confirmation
6. Produ
Q2: What is the process for before placing orders if we need to open the new tool
  Once the pack confirmed, we will run the following process
1. Quotation / Price/ Trade terms
2. Rendering/ Technical drawing confirmation 
3. Place tool order /New tool process
4. Testing sample submit
5. Artwork - LIBO will provide deco area
6. PPS sampling/ Order 
7. PPS confirmation
8. Production - need to check the shipping place and forwarder information
2. Artwork - LIBO will provide deco area
3. PPS sampling/ Order 
4. PPS confirmation
5. Production - need to check the shipping place and forwarder information
Q3: Can I change the material after tool done?
  No. ABS mold cannot do PET material. PET mold cannot do ABS material. Therefore, we always need to confirm the material requirement first before open new tool.
Q4: If the item which is based on ABS, can we change the material from ABS to PET or any other sustainable materila?
  No. ABS mold cannot do PET material. PET mold cannot do ABS material. Therefore, we always need to confirm the material requirement first before open new tool.
Q5: Could you provide the certificatation of PCR material.
  Yes, we can provide our raw material brands MSDS and material certification.
Q6: How long will it take for the new tooling?
  Generally the average tool time is around 45 days, it depends on how complex the mold design is. After tool done, we also need to run the new tool trial. It approximatly take 4-6 weeks. We will have T0, T1 and  T2.  We would sumbit the sample for initial review on T1 stage. The final PPS will be made after T2 stage if tool trial improved at this stage.
Q7: Could you provide the timeline?
  1. Testing sample submit 21days
2. Artwork checking - 3 days.
3. PPS sampling - 21 days
4. PPS confirmation - 7 days
5. Production - around 45 days if order quantity below 50k. If above 50k, we need to specially check how many days we need to finish the production schedule.
Q8: What is the typical lead time for production?
  Our standard production lead time around 45 days if order quantity below 50k. If above 50k, we need to specially check how many days we need to finish the production schedule. It still depends on what kinds of decoraion you will have.
Q9: Is it possbile to chagne the applicator type? If so, would it comes with any other extra charge?
  After checking with engineer, it is available to adjust according to the need. However,the rod need to match the new brush and need revise the tool. There is extra tool cost around 6000 USD. Please adivse if you confirm the change and tool fee.
Q10: Can we do split shipment?
  Yes, you can tell me how do you split the order quantity. I could revise the timeline to show you the overall shipping schedule

LIBO Beauty Packaging Experts

Specializing in beauty packaging design, engineering, and manufacturing, LIBO’s team of packaging experts combines market insights with hands-on product development experience to explore what’s next in materials, structures, functionality, and sustainable design. With expertise in packaging trend analysis, we bring a practical development and manufacturing perspective to how emerging concepts can be transformed into commercially viable beauty packaging solutions.